Smart Yard
RUN
MOVEMENTS
SIGNAL NOTES
▶ Start
👁 Show All
Tracks (in order)
Add
Clear Tracks
Load Selected
Signals used in this movement
(e.g. 251, A707)
Add
Clear Signals
Preview
All Tracks
(click to add):
💾 Save Movement
🗑 Delete
Write / Update Note for Signal
💾 Save Note
🗑 Delete Note
Saved Notes
(click to load)
S.M
C OF STATION BUILDING
HIGH LEVEL PASSENGER PLATFORM
R.L. PASSENGER PLATFORM
PAVING
PAVING
TO C.C.I.
LEVEL
(’C’ CLASS)
KM.369/6
GATE
X-ING NO.173
3RD LINE
P
LINE NO.
1
7
LINE NO.
1
6
LINE NO.
1
5
LINE NO.
1
4
LINE NO.
1
3
LINE NO.
1
2
LINE NO.
1
1
LINE NO.
10
LINE NO.
9
LINE NO.
8
LINE NO.
7
LINE NO.
6
LINE NO.
5
LINE NO.
4
LINE NO.
3
LINE NO.
2
LINE NO.
1
GOODS STABLING LINE
BLOCK RAKE SIDING
GOODS RUNNING LINES
GOODS LINE
GOODS RUNNING LINES
COMMON GOODS RUNNING LINES
DN LOOP
DN MAIN
UP MAIN
MAIN LINE
COMMON LOOP
P
P
P
G
G
UP
UP
DN
C
314
94
B
B
97
196
198
C
98
318
100
96
93
55
155
153
53
193
S
151
51
A100
A96
UP BT DDL-BH’01’
DN
DN:BLOCK HUT ‘01'-DDL
165
167
166
194
191
125
PANEL
R.R.I. CABIN
130
102
103
101
105
104
P
C
P
P
P
C
B
B
BSLB
S-3
303
S-1
301
A3
A1
AA3
AA1
3RD LINE
S-2
S-4
SHUNTING NECK
UP/DN BT DDL-SNL
UP
DN
UP BT:DDL-SNL
UP
DN
S
128
28
126
26
106
S-6
S
108
S-8
S
169
S-69
S
171
S-71
S
173
73
S
175
75
S
77
177
S
179
79
S
181
81
S
83
183
190
189
187
185
S
S-10
110
S
S-12
112
S
S-14
114
S
S-16
116
S
S-18
118
S
22
122
S
24
124
107
S-7
ML
C
C307
ML
C
192
312
92
PUNJAB ELECTRICITY BOARD SIDING
TO AMBALA CANT
DN BT:DDL-SNL
UP/DN:BT (AC)
DDL-LDH
FROM LUDHIANA
T1
T2
T3
T4
T5
T6
T8
T7
T9
T10
T11
T12
T14
T13
T15
T16
T24
T17
T19
T22
T23
T21
T20
T18
T25
T26
T27
T28
T29
T30
T31
T32
T33
T34
T35
T38
T37
T36
T39
T40
T41
T42
T43
T44
T45
T46
T47
T49
T51
T52
T48
T50
T53
T54
T55
T56
T57
T65
T58
T59
T60
T61
T62
T63
T64
T66
T67
T68
T69
T70
T72
T73
T71
T74
T75
T76
T77
T78
DHANDARI KALAN (DDL)
STATION YARD LAYOUT